在线国产一区二区_成人黄色片在线观看_国产成人免费_日韩精品免费在线视频_亚洲精品美女久久_欧美一级免费在线观看

Global EditionASIA 中文雙語Fran?ais
China
Home / China / Society

World's longest-span cable-stayed bridge undergoes load test before opening

Xinhua | Updated: 2025-06-19 10:09
Share
Share - WeChat
An aerial drone photo taken on May 24, 2025 shows the Changzhou-Taizhou Yangtze River Bridge under construction in East China's Jiangsu province. [Photo/Xinhua]

NANJING -- The final pre-opening safety checks have begun on the Changtai Yangtze River Bridge, the world's longest-span cable-stayed bridge, as engineers launched a high-stakes week-long load testing campaign on the hybrid rail-road structure early Tuesday in East China's Jiangsu province.

A series of scientifically rigorous load tests will thoroughly evaluate the actual performance of this world-class multifunctional bridge, which will provide crucial data for its subsequent safe operation, according to the Jiangsu provincial transport engineering construction bureau, the bridge's developer.

Spanning 10.03 kilometers, this engineering milestone integrates highways, intercity railways, and local roads across two levels. Its main channel features a record-setting 1,208-meter central span supported by cables, while its two auxiliary channel bridges each boast 388-meter steel arch spans, the longest worldwide for their type.

All load testing occurs exclusively at night to avoid temperature fluctuations affecting the steel-based structure, with over 800 sensors deployed to track micrometer-level structural shifts, according to the bureau.

During the first night's static test, 30 four-axle trucks weighing 1,200 tonnes were positioned like "six vehicles side-by-side on the upper highway deck and four on the lower rail-road deck," according to technicians, mimicking the weight of 800 passenger cars. The trucks remained stationary for eight hours to measure structural responses.

Seven days of trials cover 119 static and 111 dynamic scenarios across all bridge sections. The most intense static test will mobilize 110 trucks weighing 4,400 tonnes simultaneously on the main span, according to the bureau.

Dynamic examinations later this week include simulated traffic flows with braking and bumping sequences.

Scheduled for completion by late 2025, the bridge will slash travel time between Changzhou and Taizhou in Jiangsu province from 80 minutes to 20 minutes, boosting development for the Yangtze economic belt and integration of the Yangtze River delta region.

Top
BACK TO THE TOP
English
Copyright 1995 - . All rights reserved. The content (including but not limited to text, photo, multimedia information, etc) published in this site belongs to China Daily Information Co (CDIC). Without written authorization from CDIC, such content shall not be republished or used in any form. Note: Browsers with 1024*768 or higher resolution are suggested for this site.
License for publishing multimedia online 0108263

Registration Number: 130349
FOLLOW US
 
主站蜘蛛池模板: 国产在线精品一区二区 | 亚洲国产成人精品女人 | 日本高清视频www | 免费黄色激情视频 | 一级片在线观看 | 久久专区 | 成人黄色三级视频 | 成人欧美一区二区三区黑人孕妇 | 99精品视频一区 | 久久视频精品 | 另类 综合 日韩 欧美 亚洲 | 日本a在线 | 久久久久久免费免费 | 国产色在线 | 黄色在线免费 | 中文一二区 | 国产成人亚洲欧 | 国产精品美女久久久久久久网站 | 亚洲欧美另类久久久精品2019 | 日本免费福利视频 | 五月综合久久 | 免费的黄色av网站 | 国产成人99 | 亚洲成人在线网站 | 欧美成人免费 | 国产欧美精品区一区二区三区 | 国产精品一区二区三区网站 | 久久久久久久久久国产精品 | 亚洲码欧美码一区二区三区 | 免费观看性欧美大片无片 | 欧美1区 | 亚洲一区在线免费观看 | 黄页网址免费在线观看 | 日韩精品久久久久 | 干狠狠 | 手机看片169 | 亚洲午夜精品一区二区三区他趣 | 成人毛片久久 | 91视频观看 | 国产精品一区二区在线播放 | 91在线精品一区二区三区 |